195
12 Click Print to print the summary, or click Finish
to exit the Wizard. If necessary, scroll down to
access the Print and Finish buttons.
When you are done using the wizard, initialize the
panel(s) that were just added. To initialize the
panel(s) click on Operations then Control Map and
click on the plus sign (+) by Quick Start Control
Area to open up the branch. Right click on the panel
that was added and select Initialize, Select All and
click OK. A panel initialization status window will
display the initialization progress. Repeat the
procedure for as many panels as were added to the
system. Multiple panels can be initialized at the same
time on an RS-485 line, if C-100 is being used,
initialize one panel at a time.
If this is a first time the wizard was run and there
were no previously defined WIN-PAK
communication ports, then the communication
server needs to be restarted. Restart the
communication server by stopping it from the WIN-
PAK Service manager and then start it. An error
indicating that communication server is not
responding will appear [if the WIN-PAK User
Interface is open]. Click OK.
When the communication server is started, another
message will appear several seconds later indicating
that it is now working. This procedure only needs to
be done once, the first time. All other additions
made by the wizard will become available
immediately after the wizard is finished.
Programming